Verification Testing
If you work with an independent tester, be sure to make them a part of the project from the being. This includes design meetings. Their job is to look at the requirements and figure out how to test them. Take the time to explain your design and development to your test engineer. Do not focus so much on the coding that you neglect your team. Speaking of requirements, the only hurricanes New Orleans requires are the mixed drinks. Don't ya think? Tomorrow I plan to discuss performance testing. Posted at 7:00 AM
|
Search
Recent Entries
Mines of Kevos
For the Veterans Deep and Wide Heroic Adventures Glad That I Was Born Creative Limit Archon 32 Recap Trip Back Home You're Gonna Pi, Pi, Pi Blues on Purpose (Older Entries) Other Journals
License
RSS Feed
|